Media Center

3 traffic line “motivation” of Nhon Trach is completed within July 2021

The 319 Road connects Nhon Trach Ward (Dong Nai province) with HCM City – Long Thanh highway is completed; expecting to expand 25B provincial highway (up to 80m) and 25C road connects with 51 National roads and Long Thanh airport seen as the crucial road which stimulates for real estate market in the particular and social economy of Nhon Trach (Dong Nai) in general.

 

The prolonged 319 Road in Nhon Trach Ward finished and waiting for the final procedure to connect with Ho Chi Minh – Long Thành – Dau Giay highway.

The project of prolonged 319 Road starts in 2017 for Cuong Thuan IDICO Developed Investment Joint Stock Company is an investor. The road has started point at the Ben Cam intersection (Nhon Trach Ward, Đong Nai Province) and the endpoint interacts with Ho Chi Minh – Long Thanh – Dau Giay highway. The asterisk intersection is an important item of the project connecting this road with the expressway.

The whole route is 9,4 km including the main route nearly 2,4 km in length, 16m in width and the branches more than 7 km and 8m in width. The total expenditure of the project was nearly 1.000 billion VND.

The project has 4 bridges, of which 2 located in two parallel paths with Ho Chi Minh – Long Thanh – Dau Giay highway. Each bridge has 2 lanes, one-way direction.

The prolonged 319 Road across Phuoc Thien commune, Nhon Trach Ward. After putting into operation, the route will help connect the expressway with the industrial park in Nhon Trach Ward… shorten the time to transport goods in Ho Chi Minh City and reverse. Besides, in the future, the route connecting with Phuoc An bridge through Ba Ria – Vung Tau inter port-road with Cai Mep – Thi Vai Deep seaport reducing congestion for 51 National roads especially the interaction of Long Thanh Ward.

 

Source: cafef.vn